Barry wrote:Thanks Barry. The priorities are setup correctly. As I said, I get the correct deduction in volume - according to the priorities setup - but the visualization is wrong. This has happened with other elements, mainly those modelled with the slab tool.
You said that the pad and pile have "different material priority".
You are correct with that - you just need to make sure your pile has a stronger Building Material Intersection Priority than the pad.
Barry.
2015-02-27 03:12 AM
2015-03-04 04:58 PM
Barry wrote:Sorry for the delay.
What is the strength of you pad Building Material and what is the strength of you pile Building material?
Barry.
2015-03-05 02:25 AM
2015-03-05 02:27 AM
2015-03-05 02:29 AM
2015-03-05 02:44 AM
2015-03-17 04:12 PM
Barry wrote:
As for your slab to slab connections there is no automatic connection for those.
You must use Solid Element Operation to make the connections.
Here is a chart (from the reference guide) showing what can connect to what and if the connections are completely automatic (green), required you to invoke the 'connect' command (blue) or only interact with SEO (red).