2004-04-09 06:05 AM
2004-04-09 06:40 AM
2004-04-09 07:08 AM
2004-04-09 07:11 AM
I wrote:I can say without hesitation that if it weren't for this forum, I absolutely could not be productive.
Someone asked me at ACUWest if AC allowed me to be productive as an architect. I answered "Absolutely". If I was asked today I just might have a different answer.
2004-04-09 08:57 AM
Dave wrote:Nope, but it takes quite some time (I presume you are live linking?) to update. I use the shadows all the time on proposal sets (makes up for emptyish elevations) and aside from taking a bit to update (what is the lunch break for?) it works OK. Albeit, XP.
Is it necessary to unlink a S/E with cast shadows in order to import into PM? I've tried it still linked and I get an error message that AC is not responding.
2004-04-09 08:56 PM
Djordje wrote:Do you get messages that say AC is not responding during the process? After 8 or 9 minutes I get such a message, so I've cancelled the process.
Nope, but it takes quite some time (I presume you are live linking?) to update.
2004-04-09 11:54 PM
2004-04-10 02:55 AM
~/archiben wrote:I gave it a whirl earlier today on a small elevation, and it did indeed work. I've never seen those messages before. Now I know what all the complaints about bAC are about. I hadn't used vectorial shadows on my elevations before. Ouch!
dave' just let it run . . . it gets there in the end: ignore the "not responding" messages!
2004-04-10 06:29 AM
Dave wrote:Well, the stupid thing is so busy that it is not responding ... pretty much as if you are concentrating on something, and someone starts telling you something completely different - will you hear them?
Do you get messages that say AC is not responding during the process? After 8 or 9 minutes I get such a message, so I've cancelled the process.