Hi all,
Is there a way to show the Transmittal Set Date on all included Layouts even if a Change has not been added to them?
eg.
Issue "Drawing A rev 01" to the engineer on the 1st, I create and close a Transmittal and it shows on my Layout as "01 Issue to Engineer 01/xx/xx"
Issue "Drawing A rev 01" to the interior on the 2nd, I create and close a new Transmittal and have it now show on my layout the previous as well as "01 Issue to Interior 02/xx/xx"
Ling.
Operating system used: Mac Intel-based
| AC22-29 AUS 3200 | Help Those Help You - Add a Signature |
| Self-taught, bend it till it breaks | Creating a Thread |
| Win11 | i9 10850K | 64GB | RX6600 | Win11 | R5 2600 | 16GB | GTX1660 |
3 hours ago
I think you can manually add the Layout to the Transmittal even if no change has been applied, I am just not sure if it then will retain the existing revision code, I think it does.