cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Learn to manage BIM workflows and create professional Archicad templates with the BIM Manager Program.

Sustainable design
About EcoDesigner, Energy Evaluation, Life Cycle Assessment, etc.

LAUNCH ENERGY EVALUATION

Anonymous
Not applicable
Before launching the simulation :

- Do I first create the THERMIC ZONES or the STRUCTURES - before launching the simulation ?
1 REPLY 1
Laszlo Nagy
Community Admin
Community Admin
I cannot answer your specific question because I hardly ever used EcoDesigner, but there is a getting started with EcoDesigner guide, which may give you a good idea of how to go about doing it:

https://www.thomsonarchitecture.ca/2020/08/15/archicad-ecodesigner-and-passive-house/
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28