Robert wrote:
Is this the expected behavior? Kind of a nuisance. (cross-posted to TW board).
No need to cross post - but thanks for letting us know.
I have removed the other post (it had no replies).
I don't use teamwork but I always thought the schemes are not part of the job file, but are a machine setting, like the Work Environment is.
I may be wrong because you say it sent and received a new scene.
But then why does it not adjust amended scenes?
Sorry, I don't have an answer to explain it.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11