Can we please have the option to lock the default renovation filter.
The common problem is when selecting New status as the default, it does not remain the default, at some point it goes back to existing status, however drawing work continues without realising the default his now existing.
Later in the day when this error is spotted, time is wasted going back over work and moving things onto new status.
Not sure why this happens, but a simple lock would be great.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.