2010-07-20 12:52 AM
2010-07-21 05:59 PM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2010-07-21 08:19 PM
2010-07-21 08:23 PM
2010-07-22 12:46 AM
gkmethy wrote:Beware. You can delete the view of the schedule and it will still be in the Layout. And still show up as a drawing on the laout sheet. You can even updated it but nothing actually happens. You only think you are updating it.
Calculation Unit is a global setting of the project. It is not stored at a view level. If all the schedules are live (i.e. their source view has not been deleted) and if one updates all the placed schedules, they will all display the same unit. To achieve schedules with different unit settings, one has to set them 'manual update', and change the project preferences/calculation unit settings between updates. I did not find a difference in schedules' behavior depending on the way you place them.
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2010-07-22 12:51 AM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2010-07-22 06:31 AM
gkmethy wrote:Thanks for the correction.
Calculation Unit is a global setting of the project. It is not stored at a view level. If all the schedules are live (i.e. their source view has not been deleted) and if one updates all the placed schedules, they will all display the same unit. To achieve schedules with different unit settings, one has to set them 'manual update', and change the project preferences/calculation unit settings between updates. I did not find a difference in schedules' behavior depending on the way you place them.