Bruce
Advisor

Calculated fields

I have been asked to add a 'contingency' quantity to a schedule, which is a percentage of the quantity in the model. So, for example, if there are 26 in the model, I need to add 4 as contingency, making a total of 30 to be ordered from the supplier.

I'm not aware of Archicad being able to calculate fields - but does anyone have ideas on how to do this without having to export to Excel? Given I have a preview associated with each part, any update would require a re-export of the Excel file, adding of addition rows (formatting, formulas), changing of page layout to export as a PDF to bring back into Archicad.

It would be much simpler if I could keep this in the .pln file as a schedule.
Bruce Walker
Barking Dog BIM YouTube
Mindmeister Mindmap
-- since v8.1 --
AC27 5060 INT Full | Windows 11 64 Pro | 12th Gen Intel i7-12700H 2.30 GHz | 64 Gb RAM | NVIDIA GeForce RTX 3060 32 Gb
1 Reply 1
alemanda
Expert
no way in AC21.
AC22 has some possibilities for that, otherwise export to Excel.
eng. Alessandro Mandala - Italy
AC27 latest hotfix
Win 11 Pro 64bit
Ultra 9 275HX 64GB GeForce RTX 5070ti