We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Calculated fields

Bruce
Advisor
I have been asked to add a 'contingency' quantity to a schedule, which is a percentage of the quantity in the model. So, for example, if there are 26 in the model, I need to add 4 as contingency, making a total of 30 to be ordered from the supplier.

I'm not aware of Archicad being able to calculate fields - but does anyone have ideas on how to do this without having to export to Excel? Given I have a preview associated with each part, any update would require a re-export of the Excel file, adding of addition rows (formatting, formulas), changing of page layout to export as a PDF to bring back into Archicad.

It would be much simpler if I could keep this in the .pln file as a schedule.
Bruce Walker
Barking Dog BIM YouTube
Mindmeister Mindmap
-- since v8.1 --
AC27 5060 INT Full | Windows 11 64 Pro | 12th Gen Intel i7-12700H 2.30 GHz | 64 Gb RAM | NVIDIA GeForce RTX 3060 32 Gb
1 REPLY 1
alemanda
Advocate
no way in AC21.
AC22 has some possibilities for that, otherwise export to Excel.
AC27 latest hotfix

Win 10 Pro 64bit

Double XEON 14 CORES (tot 28 physical cores)

32GB RAM - SSD 256GB - Nvidia Quadro K620

Display DELL 25'' 2560x1440

www.almadw.it