We value your input! Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey
2008-12-08 05:34 PM
2008-12-08 07:25 PM
2008-12-08 08:16 PM
2008-12-09 01:51 AM
2008-12-09 12:05 PM
Aaron wrote:Take a look at FrameWright. It's designed to do this kind of scheduling, including cut lists that round to required size increments and group timber with common dimensions.
I'd like to schedule the sum of roof ridges and valleys in lineal feet. My thought would be to create lengths of roof that correspond in pitch and length to the ridges and valleys. isolate them on a non-printing layer and create a schedule item for them. Any ideas about a better way?
2008-12-12 12:19 AM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2009-01-07 06:42 PM