Mmmmm...
I thought it would have been easier ...
So in these cases of new and to be demolished openings mixing each other this is the workaround ...
Also, I have to add an other opening to not be considered in volume quantity take off: the new big one (given by the sum of the two yellow ones and the central part of the small existing one). This will be the new design one ...
Correct?
eng. Alessandro Mandala - Italy
AC27 latest hotfix
Win 11 Pro 64bit
Ultra 9 275HX 64GB GeForce RTX 5070ti