Door/Room Schedules - how to leave out other floors?

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2010-02-24 03:17 PM
‎2010-02-24
03:17 PM
the building itself has 10 floors.
I only want to use a Room-Finish Schedule for a small portion of only 1 of the floors. what's the best technique for accomplishing this?
Also, the new office layout has "new doors" and the building has "existing doors". How do I separate the "new" from the "existing" and only show a door schedule with the "new" doors I want to call out?? Again, what's the best technique for this one?
...Bobby Hollywood live from...
i>u
Edgewater, FL!
SOFTWARE VERSION:
Archicad 22, Archicad 23
Windows7 -OS, MAC Maverick OS
i>u
Edgewater, FL!
SOFTWARE VERSION:
Archicad 22, Archicad 23
Windows7 -OS, MAC Maverick OS
Labels:
- Labels:
-
Data management
4 REPLIES 4

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2010-02-24 03:53 PM
‎2010-02-24
03:53 PM
I usually will separate the different wings of a building by naming the rooms with prefixes (ex: E101, E102, W101, W103, or A101, B101, C101, etc). This way I can separate and group the room Zones in my Schedules.
I use a similar tactic with separating doors (with prefixes for wings and/or other differences like new/existing/relocated, etc.).
I use a similar tactic with separating doors (with prefixes for wings and/or other differences like new/existing/relocated, etc.).
David Larrew, AIA, GDLA, GSRC
Architectural Technology Specialist
a r c h i S O L U T I O N S
WIN7-10/ OSX 10.15.7
AC 5.1-25 USA
Architectural Technology Specialist
a r c h i S O L U T I O N S
WIN7-10/ OSX 10.15.7
AC 5.1-25 USA
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2010-02-24 04:14 PM
‎2010-02-24
04:14 PM
To exclude existing doors you can exclude doors on the existing walls layer. Of course this doesn't work if you have new doors in existing walls. This is why I usually give the existing doors an ID of "EXIST" and exclude them from the schedule by that criterion.

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2010-02-24 05:27 PM
‎2010-02-24
05:27 PM
Conversely you can set the criteria that the schedule will only list doors that e.g. start with 'D'. This approach will exclude all other door openings placed. Similar for windows.
Erika
Architect, Consultant
MacBook Pro Retina, 15-inch Yosemite 2.8 GHz Intel Core i7 16 GB 1600 MHz DDR3
Mac OSX 10.11.1
AC5-18
Onuma System
"Implementing Successful Building Information Modeling"
Architect, Consultant
MacBook Pro Retina, 15-inch Yosemite 2.8 GHz Intel Core i7 16 GB 1600 MHz DDR3
Mac OSX 10.11.1
AC5-18
Onuma System
"Implementing Successful Building Information Modeling"

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2010-02-24 07:14 PM
‎2010-02-24
07:14 PM
thanks all.
will try your suggestions.
will try your suggestions.
...Bobby Hollywood live from...
i>u
Edgewater, FL!
SOFTWARE VERSION:
Archicad 22, Archicad 23
Windows7 -OS, MAC Maverick OS
i>u
Edgewater, FL!
SOFTWARE VERSION:
Archicad 22, Archicad 23
Windows7 -OS, MAC Maverick OS