Richard wrote:This is similar to how I corrected the problem when migrating from AC9 to AC10, but it had no effect in AC11.
Deleting the schedule from the View Map and recreating the view while everything was unlocked and displayed fixed the problem, if I recall correctly.
2008-02-06 10:33 PM
2008-02-06 10:46 PM
Richard wrote:It is the same (identical) Zone Object. I sent the files to GS Tech Support 3 months ago, but haven't heard back.
Is it possible that the AC11 zone stamp that you're using has changed the names of the parameters slightly?
2008-02-07 03:30 AM
2008-02-07 08:01 PM
vfrontiers wrote:This has always been a problem, ASAIK: archicad-talk.graphisoft.com/viewtopic.php?t=13401
Bugger is that some doors are referenced to the OUTSIDE (where there is no zone. And it's too inconvenient (or impossible) to flip and mirror these doors (it will be INCORRECT in plan view).
vfrontiers wrote:And this never scheduled correctly anyway (RE: above link).
Tried the old MOVE THE MARKER TO THE ROOM but that no longer works (c. 8.0)
2008-02-07 10:34 PM
2008-02-07 10:38 PM
vfrontiers wrote:Hey Duane,
All of sudden today the schedule is picking up the zones.
Bugger is that some doors are referenced to the OUTSIDE (where there is no zone. And it's too inconvenient (or impossible) to flip and mirror these doors (it will be INCORRECT in plan view).
Tried the old MOVE THE MARKER TO THE ROOM but that no longer works (c. 8.0)