After years of resistance, i'm trying to evolve from lists to schedules.
Working with materials i have had some succes with composite walls and slabs, but I am totally stuck with objects and windows/doors
I can't obtain absolutely no data of windows or doors in the schedule, the schedule is always empty as if I had none, no matter what changes i make.
I suposse, because they are in the menus, that I should have at least windows (with glazing) and doors areas (I should have also blinds, sills and lintels, but I would try that later)
I would like to know if I'm doing something wrong or if is actually impossible to obtain these data with schedules and should stay with my old and efficient lists some years more.