I would like to have two Schedules on the same layout one displaying zone areas in square feet and the other in square meters.

I have set up two views one using dimension settings for sqft and the other uses sqm but they display and print with the current Dimension settings. Is there away round this or is it impossible?

ta muchly in advance
AC versions 3.41 to 25 (UKI Full 5005).
Using AC25 5005 UKI FULL
Mac OSX 10.15.7 (19G2021) Mac Pro-2013 32gbRam AMD FirePro D500 3072 MB graphics
7 REPLIES 7
Link
Graphisoft Partner
Graphisoft Partner
You can use two different dimension standards for schedules. To confirm or change them highlight your view in the Navigator/Organizer and hit the Settings button.

Cheers,
Link.
fuzzytnth3
Booster
Link wrote:
You can use two different dimension standards for schedules. To confirm or change them highlight your view in the Navigator/Organizer and hit the Settings button.

Cheers,
Link.
Yup that's how I set them up but if I have them on the same layout then it will display the settings that are current in ArchiCAD. I'm going to try turning off Auto Updating and only update the viewport that is different to the current settings.
AC versions 3.41 to 25 (UKI Full 5005).
Using AC25 5005 UKI FULL
Mac OSX 10.15.7 (19G2021) Mac Pro-2013 32gbRam AMD FirePro D500 3072 MB graphics
fuzzytnth3
Booster
fuzzytnth3 wrote:
I'm going to try turning off Auto Updating and only update the viewport that is different to the current settings.
That sorted it out but it was a bit of a rigmarole

Switched both Viewports to "Manual" update

Changed the ArchiCAD preferences to display sqm

Updated the "Sqm" viewport to now display sqm
AC versions 3.41 to 25 (UKI Full 5005).
Using AC25 5005 UKI FULL
Mac OSX 10.15.7 (19G2021) Mac Pro-2013 32gbRam AMD FirePro D500 3072 MB graphics
Andy Thomson
Advisor
You can probably mod a zone stamp to give both areas, and even call them in the same schedule, being two distinct parameters and all.... I'd like to try this one out myself. I have roomsize objects that give w x d, one in feet, one in metres, but have never used them both at the same time...they probably work, so zone stamps should too if set up this way...
Andy Thomson, M.Arch, OAA, MRAIC
Director
Thomson Architecture, Inc.
Instructor/Lecturer, Toronto Metropolitan University Faculty of Engineering & Architectural Science
AC26/iMacPro/MPB Silicon M2Pro
I can not seem to get my components lists to match units.
I made a schedule ( Components by layers) for studs. It worked just fine and is interactive. Units are in feet and inches.

I duplicated the schedule, then changed the layer, and one Schedule field. This new (duplicated) schedule is not interactive, and the units are in decimal feet. I can not find a way to change it into feet and inches again.

The problem I think is in the Schedule field settings. ?

The schedule field is from the Available Parameters list for walls. ( I modeled the studs and plates as walls) "Length of wall measured to the Reference Line side"( I need this setting instead of "height" for my plates which are just short walls) If I choose this, my units change and the schedule is no longer interactive either.

I suppose the problem is with modeling the plates as short walls.
Apparently you can't adjust the length of a wall like this in an interactive schedule. If I select a parameter or "height" as on the studs, it does work.
And is in feet and inches in the same schedule.

How can the units be changed? The usual way of doing it in viewsettings for the schedule does not work for this. I would settle for not having an interactive schedule if I could just get the untits to be in feet and inches.

Notice in this picture that units are not even the same, in the same schedule.

ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25

Andy Thomson
Advisor
Steve, I've seen buggy numeric display, like triple zero entries in cost fields, that seem to go away after a few random rebuilds. It seems tricky getting the view settings to 'stick'. With the schedule open, and after modifying the current dimension styles and/or units preferences, have you open the settings of the 'view' of the schedule (not it's project map item) and hit the 'get current window's settings' button?


After a rebuild or close/open the view - then what do you get?
Andy Thomson, M.Arch, OAA, MRAIC
Director
Thomson Architecture, Inc.
Instructor/Lecturer, Toronto Metropolitan University Faculty of Engineering & Architectural Science
AC26/iMacPro/MPB Silicon M2Pro
Yes, I have tried that. Still looks like this.

ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25