We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Scheme Settings - Calculated Field

Anonymous
Not applicable
Can you add a field to a Scheme Schedule that is a multiple or derived for a calculation of a fixed number or even a calculation of two other fields?
1 REPLY 1
Laszlo Nagy
Community Admin
Community Admin
It is not possible to do.
This has been wished for for a long time:

http://archicad-talk.graphisoft.com/viewtopic.php?t=21689
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27