Create a Property, make it available for Zones, and set the value of the Property to the same values for all Zones you want to be calculated together. Those Zones do not have to be on the same Story. Then use this Property value in schedule criteria and fields.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27