when placing windows and doors etc. each instance is numbered in sequence, but if i delete a window, say number 6, the next one i place will be out of sequence. ie: 3,4,5,7. is there some way to reset this. what i'm doing is creating a template, so i've been creating favourites, now if i start a new project with this pln as a template the first window i place will be #12 and the first section will be #5. if i save this pln as a template will it erase all the history?
WB
5 REPLIES 5
Eduardo Rolon
Moderator
Under Document Menu -> Chedules and Lists -> Element ID Manager.

You will have to select the windows in the order you want to renumber if I remember correctly.
Eduardo Rolón AIA NCARB
AC27 US/INT -> AC08

Macbook Pro M1 Max 64GB ram, OS X 10.XX latest
another Moderator

vistasp
Advisor
Does this tutorial help?

http://youtu.be/s_8czLAbuJA
= v i s t a s p =
bT Square Peg
https://archicadstuff.blogspot.com
https://www.btsquarepeg.com
| AC INT | Win11 | Ryzen 5700 | 32 GB | RTX 3050 |
Anonymous
Not applicable
That's great, thank you. I couldn't figure out why the detail was there in 3D but not in plan.
WB
vistasp
Advisor
You're welcome although I think you wrote that in the wrong thread, Bob.
= v i s t a s p =
bT Square Peg
https://archicadstuff.blogspot.com
https://www.btsquarepeg.com
| AC INT | Win11 | Ryzen 5700 | 32 GB | RTX 3050 |
Anonymous
Not applicable
oops, but thanks none the less. that solved it, plus helps me understand more features in AC