2010-10-01 09:19 PM - last edited on 2023-05-30 12:24 PM by Rubia Torres
2010-10-06 03:19 PM
2010-10-06 04:14 PM
2010-10-25 05:23 AM
Erika wrote:I agree with this 100%. I have all my details (and I have a lot) in my template. They are categorized by construction type in several worksheets so as soon as I start a new job I can cull out the unnessary details immediately to reduce file size then I just re-size numerous copies of the detail worksheet to fit whatever details I need on the layout. This makes for quicker and smoother workflow than using links and you can change them as needed on the fly and also not have unnecessary or unwanted changes made to them by auto updating if your linked master changes.
Mickey,
That aside, I would suggest placing details you typically use directly in your template. This will have them pre-linked and any project customization will not affect any other project and the detail will retain the changes.