We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Documentation
About Archicad's documenting tools, views, model filtering, layouts, publishing, etc.

How to assign renovation status to detail markers?

Paul King
Mentor
I may be going blind, but cannot for the life of me see how to set the renovation status of a detail marker.
Grid markers, dims and text can have renovation status, so why can't detail markers? They are used in pursuit of the same documentation intent.

I would have thought it entirely foreseeable that detail references applying to a new building work status plan would not apply on a demolition status plan.

Yes, there is a workaround using layers, but this is an extra step and is an aberration in that it is otherwise completely unnecessary to define different layer combos for different phases of work.
PAUL KING | https://www.prime.net.nz
ArchiCAD 8-28 | Twinmotion 2024
Windoze 11 PC | Intel Core i9 10900K | Nvidia Gforce RTX 3080 | 32 Gb DDR3 | 2x4K monitor extended desktop
2 REPLIES 2
Eduardo Rolon
Moderator
Known limitation. Same with any kind of marker.
Eduardo Rolón AIA NCARB
AC27 US/INT -> AC08

Macbook Pro M1 Max 64GB ram, OS X 10.XX latest
another Moderator

zcgt21
Contributor

For the moment that possibility doesn't exist and is frustrating (sorry for the english)