cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 

Streamline your workflows and master BIM coordination! Program starts April 28!

Documentation
About Archicad's documenting tools, views, model filtering, layouts, publishing, etc.

Link between schedule elements and 3D view

TomaszWorkLTD
Participant

I have schedules for each element type in the building from concrete m3 to bolts in the CLT walls. I am looking for an easy way of linking elements in the schedule to a particular view. How to do it? Sometimes it does work and sometimes not how to find a tutorial to deal with it? Thanks

 

Operating system used: Mac Apple Silicon Ventura

 

Screenshot 2024-07-03 at 12.34.13.jpg

3 REPLIES 3
Ernest Atanasiu
Advisor

It is not possible to link elements in a schedule to a particular view. It works sometimes because the active view might be the one you are looking for when selecting the element. 

arch. ernest atanasiu
AC 10-26 INT/GER/FR on Win 10/ Win 11

Are you from GS?

And I mean a link between BIMx and layouts e.g. you hit UFH pipe in the schedule on the layout and it directs you to a 3D object (it works) then you want to go back to the layout with pipes schedule (and it doesn't work) direct me to drainage layout. 

Setup info provided by author