I have a custom library part with a text parameter (let's call it parameter1) connected to a parameter list. I have another text parameter (parameter2) that I would like to be filled in automatically based on the choice selected for parameter1. For example if I choose "Example 1" from the parameter list for parameter 1, I want parameter2 to automatically be filled in with "EX1". Basically, I'm trying to add an additional parameter that reports an abbreviated name in an interactive schedule without having to manually enter in the abbreviated version. I've tried IF/THEN statements to no avail.
(e.g. IF parameter1 = "Example 1" then parameter2 = "EX1") Any help or suggestions would be greatly appreciated.
Also, does anyone know a way to get library parts placed directly on layouts to report in an interactive schedule?
Thanks in advance,
4 REPLIES 4
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2015-12-28 11:35 PM
2015-12-28
11:35 PM
Hello,
This should work, put in master or value script
This should work, put in master or value script
if parameter1 = "Example 1" then parameter2 = "EX1" if parameter1 = "Example 2" then parameter2 = "EX2" !--the parameter1 has now the right value in the script !--and the next line changes the user visible parameter value parameters parameter2 = parameter2
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2015-12-28 11:51 PM
2015-12-28
11:51 PM
Thanks Juha, worked like a charm. Should've thought to put it in the parameter script rather than the 2D script. Any secrets to get the interactive schedule to report objects (library parts) placed on layouts?

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2015-12-29 03:20 AM
2015-12-29
03:20 AM
Mike wrote:Schedules only look at elements in the plan views - not sections. elevations or layouts.
Any secrets to get the interactive schedule to report objects (library parts) placed on layouts?
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2015-12-29 05:49 PM
2015-12-29
05:49 PM
Well, that's what I was afraid of. GS is missing a big opportunity here to do some cool things by integrating project Submittals, RFI's, and the like onto AC layouts that could then use a library part to not only communicate with the contractor/consultants the status of the Submittal/RFI but also be used to create an automatically generated Log of said Submittals/RFI's. Not to mention the opportunity to integrate those into a BIMx file for the client to have an all-inclusive digital plan set.
Placing the Submittal/RFI pdf's on a story dedicated to each submittal/submittal type would be a work-around, but it seems clunky & not really following the BIM ideology. I'm no programmer, but this doesn't seem like it would be to difficult to improve. AC20?
Placing the Submittal/RFI pdf's on a story dedicated to each submittal/submittal type would be a work-around, but it seems clunky & not really following the BIM ideology. I'm no programmer, but this doesn't seem like it would be to difficult to improve. AC20?