2018-06-24 07:55 PM - last edited on 2023-05-19 10:34 PM by Gordana Radonic
2018-06-24 10:03 PM
2018-06-25 03:20 AM
AC22-28 AUS 3110 | Help Those Help You - Add a Signature |
Self-taught, bend it till it breaks | Creating a Thread |
Win11 | i9 10850K | 64GB | RX6600 | Win11 | R5 2600 | 16GB | GTX1660 |
2018-06-26 08:56 PM
Lingwisyer wrote:It doesn't work.
Does swapping your reference line to the opposite edge help?
Ling.
felcunha wrote:Actually it doesn't work.
Just create another plaster material with a higher priority than concrete, and assign each plaster to each composite depending on what you want...
2018-06-27 07:07 AM
AC22-28 AUS 3110 | Help Those Help You - Add a Signature |
Self-taught, bend it till it breaks | Creating a Thread |
Win11 | i9 10850K | 64GB | RX6600 | Win11 | R5 2600 | 16GB | GTX1660 |
2018-06-27 10:43 PM
Lingwisyer wrote:OMG it works! You're a god of Archicad! Thank you!
Is there any issue with creating a second Concrete for your wall with the sameIntersection Priorityas the gypsum Concrete? In that way they will join to each other and the intersection can be controlled with the Junction Order.
Ling.