thanks and yes, what you said is done without problem by 2d program but in this 3d instance, if i set the ground level at 0.00 , my site plan elevations don't match with my surveyor's values. That's my problem!
Lilian Seow
LEED AP | cSBA | CAPM | PMP
Interior-Architecture and BIM Management
AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!