alesim wrote:
1) I have an existing stair whose covering has to be demolished and renewed. The construction filter doesn't permit this operation. How could I achieve this result without demolishing the whole stair?
2) Under the same existing stair there is a plaster layer. Isn't there in the stair tool an option to add an extra layer under the structure?
Thank you to everyone who will answer.