2009-06-29 09:03 PM
2009-07-20 11:55 PM
2009-07-21 02:02 AM
Gary wrote:Don't even get me started Gary....devastated is such an understatement.
I have not read the Bill and don't intend to but I understand that a BIM is required for Commercial projects over $2.5 Mil. I have confidence in IFC and this is a great opportunity to implement it. After all, wasn't 2x2 developed to facilitate Singapore's code check?
Hey Steve, you must have been devastated with the results last November huh? Can you see Russia from your porch? Next time you talk to Sarah remind her that Africa is a Continent.
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2009-07-22 02:19 AM
Steve wrote:Would you mind sharing it with us?
And I have a picture of Sarah gutting a moose as my screen saver.
2009-07-22 03:03 AM
laszlonagy wrote:You shouldn't talk about Joe Biden that way.Steve wrote:
And I have a picture of Sarah gutting a moose as my screen saver.
2009-07-22 03:22 AM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2009-07-28 08:17 PM
2009-07-29 12:46 AM
Gary wrote:...and not very well from what I can see.
Somebody Photoshopped Palin's head into that picture...
2009-07-29 02:57 AM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2009-08-06 04:40 PM
Millions of buildings have been constructed without a BIM. The necessary, useful, and required information to construct the building all came form 2d plans, most of which did not even have the BI extracted from a digital file. All the information needed has been taken from the plans and specs.And that means that there is no need to find ways to improve