Modeling
About Archicad's design tools, element connections, modeling concepts, etc.

can i make schedule start from Ground floor ?

Anonymous
Not applicable
Hi every one i copied doors and windows from other projects of mine so i am intending to copy them always in every project if i made them in floor say -2 under ground floor can i exclude it from calculated inside schedule please tell me how and thanks
1 REPLY 1
vistasp
Advisor
Hi Ahmed,

It might look a little different in v14/15 but essentially, you have to add a criterion that eliminates all doors/windows on the storey -2.
storey option in schedules.jpg
= v i s t a s p =
bT Square Peg
https://archicadstuff.blogspot.com
https://www.btsquarepeg.com
| AC INT | Win11 | Ryzen 5700 | 32 GB | RTX 3050 |