Learn to manage BIM workflows and create professional Archicad templates with the BIM Manager Program.
2005-01-14 02:40 AM
2005-01-14 03:12 PM
batsheva wrote:
I work with archiCad 6.5 for some years, and still fill confused with managing the working planes drawings. should i arrange all my work through the plot maker by orggnaizing the layout? or make new 2D drawings using the plot command from archicad??
the files are Huge and make the work very slowly. i fill waiting to the computer all the time, although i have quiet a strong computer.
I would be very thankful to get some advises,
Batsheva.
2005-01-16 06:57 AM
batsheva wrote:If I understand you correctly you are using the 'stories' as new views for architectural / electrical / finishes information and therefore duplicating walls on several stories. This will make the file very large & slow.
I work with archiCad 6.5 for some years, and still fill confused with managing the working planes drawings. should i arrange all my work through the plot maker by orggnaizing the layout? or make new 2D drawings using the plot command from archicad??