cancel
Showing results forĀ 
Search instead forĀ 
Did you mean:Ā 
cancel
Showing results forĀ 
Search instead forĀ 
Did you mean:Ā 
Project data & BIM
About BIM-based management of attributes, schedules, templates, favorites, hotlinks, projects in general, quality assurance, etc.
SOLVED!

Date in change manager

Guillermo1
Enthusiast

Hello, 

Can the date format be modified in the change manager? DD/MM/YYYY

ā€ƒOperating system used: Mac Intel-based 14

 

Captura de pantalla 2024-04-03 a la(s) 3.10.13 p. m..png

1 ACCEPTED SOLUTION

Accepted Solutions
Solution
Lingwisyer
Guru

On Windows anyway, it reflects your system settings; Short Date. I assume macOS would be the same.

AC22-28 AUS 3110Help Those Help You - Add a Signature
Self-taught, bend it till it breaksCreating a Thread
Win11 | i9 10850K | 64GB | RX6600 Win11 | R5 2600 | 16GB | GTX1660

View solution in original post

2 REPLIES 2
Solution
Lingwisyer
Guru

On Windows anyway, it reflects your system settings; Short Date. I assume macOS would be the same.

AC22-28 AUS 3110Help Those Help You - Add a Signature
Self-taught, bend it till it breaksCreating a Thread
Win11 | i9 10850K | 64GB | RX6600 Win11 | R5 2600 | 16GB | GTX1660

Thanks! it works perfect, i change the format in System settings and restart my laptop , now looks good!

Setup info provided by author