cancel
Showing results for 
Search instead for 
Did you mean: 
EN
cancel
Showing results for 
Search instead for 
Did you mean: 
Nic Tulban
Booster

Scheduling hotlinks

Hello,

is there a way to get a schedule with data from the hotlinks in the project - name, design option, number of instances and so on - but limited to the niveau of the hotlink, not deeper (not refering the contained entities)?

Any Idea is useful!

Lot of thanks, 

Nic

2 Replies 2
Barry Kelly
Moderator

You should be able to set the schedule criteria to look only at a specific hotlink or hotlinks.

 

Barry.

One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Laszlo Nagy
Community Admin
Community Admin

If I understand this currently, you want to schedule the Hotlinks themselves as items, not elements located in Hotlinks.

Archicad does not offer such capability.

And unfortunately, I cannot even offer any workaround. The only data you can get about Hotlinks in a schedule is the Hotlink Master ID, but not their Name, the Design Option they use, of how many instances of a Hotlinked Module are placed.

 

Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac29

Didn't find the answer?

Check other topics in this Forum

Back to Forum

Read the latest accepted solutions!

Accepted Solutions

Start a new conversation!