Let me clarify with more details what we have:
1. 1 local (in the office) TW file called "NEW BLDG".
2. 1 local (in the office) TW file called "EXST BLDG".
3. 1 local (in the office) TW file called "EXST SITE".
The "NEW BLDG" TW file has both the "EXST BLDG" and the "EXST SITE" TW files hotlinked into it. Into the NEW TW file that is as hotlinkes.
We are setting a presentation on a laptop (i7 MACBOOK PRO) with all the bells and whistles.
Now, here's my question(s):
1. How do I get ALL the parts and pieces (NEW BLDG, EXST BLDG, and EXST SITE) in the same file so I can take them with me?
2. I dont need to be connected to any remote BIM server (at least not yet due to time constraints) so if the "COPY" file with all 3 parts gets manipulated and changed, so be it.
3. Keep in mind that all 3 files are TW files not PLN's. How do I save the NEW BLDG database TW file to contain both the EXST SITE as a file as well as the EXST BLDG as a file?
4. will I have to save also the existing site file AND existing bldg file as separate PLN's and relink them to the the COPY file on the laptop?
5. Will the PLN be intelligent enough to saveout the EXST BLDG and the EXST SITE as a part of the NEW or not?
Help.
...Bobby Hollywood live from...
i>u
Edgewater, FL!
SOFTWARE VERSION:
Archicad 22, Archicad 23
Windows7 -OS, MAC Maverick OS