cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
Karim L Sayed
Contributor
since 3 weeks ago
a week ago

User Statistics

  • 7 Posts
  • 0 Solutions
  • 7 Likes given
  • 1 Likes received

User activity

In my case I have from the Ground floor level to the 1st floor, 6 meters in Height, to achieve the top level of the 1st floor. I need to make a U-shaped stair with 4 flights in a rectangular staircase. Any tips or resources to do that for best practi...
hello everyone see my topic , how i can draw plot coordinates in ArchiCAD and but it in 0.0.0 coordinates of software and in same time keep my original plot coordinates in real same
 The user experiences significant delays during the startup phase of a Teamwork project in Archicad. The issue is characterized by two main symptoms:Slow Project Opening: The project takes an unusually long time to become accessible.Repeated Library ...
Likes received