cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
BIM Architects
Participant
since ‎2022-01-02
‎2022-09-23

User Statistics

  • 2 Posts
  • 0 Solutions
  • 8 Likes given
  • 0 Likes received

User activity

Hi ThereI have a hotlink with hight 3m form floor to floor and floor 100mm.On the Groudfloor I have 200mm floor.I need to lower the level of the hotlink walls to the concrete slab.How can I do it, or is it possible? Please have a look my screen.AC 25...