Archicad 17 -Possible to have MEP Pipe/duct Schedule?

Anonymous
Not applicable
I want to have the schedule of showing the length of the duct/pipe. I attempt to set the criteria to be "Layer" & “pipe", and choose the fields to be "Layer" and Length". It is strange that the schedule only display the pipe with length of 1000mm.

Any idea for showing the length of the MEP pipe/duct?

01. MEP Pipe Schedule - Criteria.jpg
10 REPLIES 10
Anonymous
Not applicable
Hi,
The answer to this forum is --->
To add the specific fields of the different MEP object inside your schedules, you need to integrate the specific fields from the MEP library before. Too do this :

1. Open the "Scheme Settings" of your specific schedule.
2. "Add Criteria" for your selected MEP objects (schedule - Elements).
3. Click on the arrow next to "add fields" and select "Library Parts Parameter".
4. Search for MEP library that content your MEP objects.
5. Search for .gms for new propositions of fields (algorithms)
6. Add your new algorithms in your "Selected Parameters"
7. Import algorithms to your "Scheme Settings"
8. Done

Good Luck