maro wrote:
Can by this added in AC25 - Schedules work also for with sections, elevations, worksheets and details?
I would not have any idea - I am just an Archicad user the same as you and have no say in what is developed.
There are wishes for this already - here is one for allowing fills in elevations to be counted in schedules.
https://archicad-talk.graphisoft.com/viewtopic.php?f=28&t=68053
Personally I don't think this will ever happen.
At present only the 3D model and 2D fills and objects in the plan views will be included in schedules.
If we also include 2D fills and objects from the sections, elevations, details and worksheets, there is the potential errors in the schedules.
Imagine you have detail of one part of your model.
You add a 2D fill or 2D object to it that is included in the schedules.
The thing is that detail may be applicable to 20 other locations in the model, but it will only count once as you only have one detail.
Whereas if it is modelled correctly in 3D, it will be placed 20 times in the model and therefore will be counted 20 times.
Not necessarily a fantastic example, but I think it highlights the potential problem.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11