Have generated a door schedule. Have floor plan open which shows doors. Attempt to edit door numbers, (or any other information). Shows that door layer is locked or hidden, when I can plainly see the doors (unlocked) on the window right behind the schedule.
If I look at layer combo, for some reason a combo other than the one displaying on the floor plan is selected. It appears that when I go to the schedule through the project map, or any other way, default combo goes to some arbitrary combo that I have not selected.
Any way to overcome this problem?