2010-11-04 05:21 PM
2010-11-04 05:49 PM
2010-11-04 05:53 PM
2010-11-04 06:10 PM
Jay wrote:Hi Jay,
even after creating a Schedule Scheme that only was to report Elements on Storys greater than or equal to 1 , it is reporting the openings that are on the -1 Foundation Story.
2010-11-04 10:03 PM
2010-11-04 10:06 PM
2010-11-05 10:09 PM
Jay wrote:I always assign an ID "HOLE" to this type of doors. That way, you can easily exclude them from any schedule. I find this by far the easiest way to filter elements from schedules (through IDs).
The Door opening is just Simple "Knockout Opening" I created for the customary notches in stem walls for door openings above.
2010-11-06 01:52 AM
Krippahl wrote:Thanks Krippahl, I may like the Hole ID labeling. Just have to remember not to select the "HOLE" doors when using the Element ID Manage to create the ID'sJay wrote:I always assign an ID "HOLE" to this type of doors. That way, you can easily exclude them from any schedule. I find this by far the easiest way to filter elements from schedules (through IDs).
The Door opening is just Simple "Knockout Opening" I created for the customary notches in stem walls for door openings above.
2010-11-06 04:40 AM