License Delivery maintenance is expected to occur on Saturday, November 30, between 8 AM and 11 AM CET. This may cause a short 3-hours outage in which license-related tasks: license key upload, download, update, SSA validation, access to the license pool and Graphisoft ID authentication may not function properly. We apologize for any inconvenience.
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Door-scheme (locked cells)

Anonymous
Not applicable
Hi,

Some of the cells in my door scheme are non-editable (and contain 3 dashes). Can anyone explain to me why, and how to fix this?

I appreciate any help.
Truls
2 REPLIES 2
David Maudlin
Rockstar
Truls:

This usually means that those particular doors do not have those non-editable parameters. The fix would involve opening these door parts in the GDL editor and adding the parameters.

You should add a Signature to your Profile (click the Profile button near the top of this page) with your ArchiCAD version and operating system (see mine for an example) for more accurate help in this forum.

David
David Maudlin / Architect
www.davidmaudlin.com
Digital Architecture
AC27 USA • iMac 27" 4.0GHz Quad-core i7 OSX11 | 24 gb ram • MacBook Pro M3 Pro | 36 gb ram OSX14
Erwin Edel
Rockstar
It could also be Properties that are added to the schedule, but are not actually assigned to that element specification.
Erwin Edel, Project Lead, Leloup Architecten
www.leloup.nl

ArchiCAD 9-26NED FULL
Windows 10 Pro
Adobe Design Premium CS5