Walls trimmed by the roof using SEO retain their trim, but not the SEO relationship.
Walls and slabs used to cut holes in roofs and floor slabs using 'subtract' do not retain either the holes or their SEO relationships.
Why did I think SEO would survive IFC?
The only trim action with SEO that even partially worked was the walls trimmed by roofs. The same elements trimmed with non-roofs , the evidence of trimming.