Tom/Jeremy:
Thanks for taking the time to reply.
I've concluded that it's easier to create a separate schedule for the skylights (Objects), than try to make the parameters fit the window schedule.
One bummer.... as objects... there is no place to input "Notes" for the object ... unless someone knows otherwise?
I'm thinking now..... if I don't have too many skylights... it maybe even easier to just draw the schedule.... as I can't get the skylight schedule to update the plan "objects". Make sense?
Thanks again,
Marc
Marc Corney, Architect
Red Canoe Architecture, P. A.
Mac OS 10.15.7 (Catalina) //// Mac OS 14.5 (Sonoma)
Processor: 3.6 GHz 8-Core Intel Core i9 //// Apple M2 Max
Memory: 48 GB 2667 MHz DDR4 //// 32 GB
Graphics: Radeon Pro 580X 8GB //// 12C CPU, 30C GPU
ArchiCAD 25 (5010 USA Full) //// ArchiCAD 27 (4030 USA Full)