About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
Is there a way to adjust the spacing between columns / rows in a restructured schedule? At the moment, it is set to 2mm, but I can't seem to find where to change this.