Hi, How can I transfer a schedule settings, as the one shown to another project?
Thank you in advance. Scott
2 REPLIES 2
Barry Kelly
Moderator
In your schedule Scheme Settings you will find an Export and an Import button.
These will transfer the 'format" of the schedule but not the data within it.

Barry.
One of the forum moderators.
Versions 6.5 to 27
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Cheers Barry, I did try that, but this time I got it.