1. I want to get the door/window schedule contained in a.mod. How do I set it up?
this is schedule in a.mod
2. Is it possible to create a door/window schedule in a.mod?
but I can't bring
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2022-07-20 04:30 PM - edited 2022-07-20 04:40 PM
In my opinion, the easiest way is to assign a Master ID to each hotlink (like exemple "A.mod" for file a.mod and so on for everyone mod files), and then in the schedule settings, select the Hotlink Master ID in the criteria, and choose "does not contain" for a.mod, or b.mod, or c.mod, or park.
Conversely, if you want the schedule to contain only a.mod elements, select "contain" for a.mod
AC 8.1 - 27 INT/POL 3001
Win11 | Ryzen 5600 | 16 GB | GTX 1650
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2022-07-20 04:36 PM - edited 2022-07-20 04:41 PM
to zone does not appear
this is schedule in a.mod
2. Is it possible to create a door/window schedule in a.mod?
but I can't bring
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2022-07-20 04:54 PM - edited 2022-07-20 05:04 PM
Or you can create a schedule in the mod file and upload schedules view maps on layouts into the main file by right-clicking "Place Drawing" and then selecting "Local file system" and choose the file where you have prepared the schedule and choose view to import.
AC 8.1 - 27 INT/POL 3001
Win11 | Ryzen 5600 | 16 GB | GTX 1650
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2022-07-20 05:03 PM
thank you
layer on ^^