ā2014-01-12
06:53 PM
- last edited on
ā2023-05-26
11:16 AM
by
Rubia Torres
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator
ā2014-01-12 06:56 PM
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator
ā2014-01-12 07:01 PM
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator
ā2014-01-12 07:08 PM
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator
ā2014-01-12 07:10 PM
ā2014-01-13 02:43 PM
ejrolon wrote:Works here. Exist is Exist Reno Status, other wall is New Status. The reference line of the Exist does go through the New wall (to the Sheathing). Don't know why it is not working in your example.
Condition B:
03 - is a connection between an existing wall and a new one. The plaster continues and it is not affected by the BMat setting even if I change them. The only way that the connection is cleaned is if I change Reno setting for the wall from Existing to New.
ā2014-01-13 02:59 PM
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator
ā2014-01-20 02:46 PM
Mac Studio M4 Max 64GB ram, OS X 10.XX latest
another Moderator