Solid Element Operations
2 REPLIES 2

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2015-04-28 10:14 PM
‎2015-04-28
10:14 PM
might be as simple as a Bring to Front Command. Hope so. ?
I have similar problems with same and insulation under my slab not being cut by the footing using priorities. :- (
I have similar problems with same and insulation under my slab not being cut by the footing using priorities. :- (
Think Like a Spec Writer
AC4.55 through 28 / USA AC27-6010 USA
Rhino 8 Mac
MacOS 15.2
AC4.55 through 28 / USA AC27-6010 USA
Rhino 8 Mac
MacOS 15.2

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2015-04-28 10:32 PM
‎2015-04-28
10:32 PM
Aaron wrote:Finally figured it out. The upgrade to AC18 did some weird things, one of which was screwing with BUILDING MATERIALS, especially those in custom profiles. The concrete building material used to create the profile (years and versions ago) had a high priority, so never had trouble cutting terrains. In the upgrade, all my foundation profiles had been re-mapped with a concrete material with priority of 1. Go figure.