Place Module
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05
08:17 AM
- last edited on
2023-05-09
04:46 PM
by
Rubia Torres
I have designed each house in a different file and the building plot to another. Trying to place each building, in the right place and elevation on the building plot, using the “place module” command, I have to place each story of each building separately. Can a module place all the stories at once?
Thank you in advance


- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 02:29 PM
Someone had a workaround for that a while back (something about saving the file out as a .mod with all-story marquee or something like that), but I do not remember what it was.

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 03:22 PM
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 03:42 PM
laszlonagy wrote:There are no Stupid Questions ...Right?
Tom, here is the link to that trick you mentioned:
http://www.archicadwiki.com/TechNotes/Multi-story_Hotlinks?highlight=%28module%29
Well. I did not understand the relationships between the Skyscraper Module Files and the "Mother" File. Like in Step 3 & 4, which file are these step performed in.
Lets say that I have a Residence (File name "House") that contains the Following Stories:
3. Third Floor
2. Second Floor
1. First Floor
-1. Pony Walls
-2. Foundation
-3. Datum
I would like to Hotlink all the Stories Except Datum to an other File called "Site".
Could someone explain the steps.
Jay

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 04:22 PM
Jay wrote:I did this and actually there are 3 files.laszlonagy wrote:There are no Stupid Questions ...Right?
Tom, here is the link to that trick you mentioned:
http://www.archicadwiki.com/TechNotes/Multi-story_Hotlinks?highlight=%28module%29
Well. I did not understand the relationships between the Skyscraper Module Files and the "Mother" File. Like in Step 3 & 4, which file are these step performed in.
Lets say that I have a Residence (File name "House") that contains the Following Stories:
3. Third Floor
2. Second Floor
1. First Floor
-1. Pony Walls
-2. Foundation
-3. Datum
I would like to Hotlink all the Stories Except Datum to an other File called "Site".
Could someone explain the steps.
Jay
A. The Mother File into which the Hotlinked Module is placed (a PLN file)
B. The Module File (a MOD file)
C. The original file that is the source of that building data (a PLN file)
Steps:
1. Take File C and save it as a module file. This step creates File B.
2. In File A, use the Merge command to merge into it File B.
3. Still in File A, draw a Thick Marquee around the merged building so all stories will be included.
4. Use the Save as Hotlinked Modules command to save the selection.
In the upcoming Dialog, you must check the Change to hotlink to the saved file checkbox and overwrite the module file (File B). Actually, you do not change the hotlink because there is no hotlink defined yet. This step will create the Hotlink for the module file, and since you have multiple Stories, it will create hotlinks for all stories.
I hope this helps.
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 05:10 PM
laszlonagy wrote:I take it you mean name the saved file as and overwrite file B?
In the upcoming Dialog, you must check the Change to hotlink to the saved file checkbox and overwrite the module file.
Anyway, fantastic tip Lazlo!
Se also:

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-05 05:14 PM
That is the same tip, Jay just asked me to elaborate it, which I did.
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28

- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2006-10-06 05:21 AM
This may not be obvious to everyone, but it's a little technique I presented to the office the other day: Hotlinking modules to themselves (circular hotlinking, I'm calling it).
We keep all project info. within a single PLN file and since we often have a different rotation on the site plan (on paper) we draw the site on the story below the floor plan (of the building). As some of you may have noticed, if you draw at one orientation and choose to rotate the PMK in PlotMaker you can end up with upside down text and other elements. It is possible to use hotlinked modules to link to another story of the same PLN file. So, if we go to the site story we can add a hotlinked module pointing to the same PLN file and place the building story on the site story and vice versa.
MODEL.PLN (story 1)->linked to->MODEL.PLN (story -1)
Now, an important thing to realize is that since you are linking to the same file you're working with the hotlink of the other story will not be recognized as updated until you save the file. So the process to update the hotlink is to save the file and then update the hotlink manually.
This allows us to draw within our drawing bounds for each plan and as we prefer the rotation to be for each project to best fit on the sheet in PlotMaker. It could also be used to link the roof story to the site or anything else you could think of.
Eric Batte
******************************************************
Be Productive. Be Efficient. Be Standardized.
The Standardized Template System for ArchiCAD
www.getstandardized.com
******************************************************
It's just a different slant on the same idea, really. But it is under-utilized IMHO - it's really quite powerful!
Cheers,
Link.