2022-12-20 09:29 PM
I have a composite slab that has the bottom (white) skin reduced in size due to having a lower building material priority. I know I can schedule the surface area of just the bottom skin, but is there a way to schedule the perimeter of the bottom skin, and not the total perimeter of the entire slab?
2023-01-10 07:41 PM
I've not been able to figure out if this is possible... does anyone know?