Yup. It's probably cause I have been working under some assumptions re:views that have been false.
I'm trying to determine a way that I can be sure that the views are rebuilt with their saved settings when they are set to manual rebuild and I do a bunch of work on the floor plan. I'd like to do this without opening each view and rebuilding separately.
I have twenty views. I'm sure there can be more on bigger jobs. How does eveybody else do it to be 100% sure that what is on the layout reflects updated (rebuilt) views.
I've also tried to verify through experimentation that updating views on the layout will automatically update manual rebuild views to show all the most current work on the layouts. Even though the views are still set to manual rebuild. That would bypass rebuilding each view separately.
It seems to work like that but can't be 100% sure.
Seems like AC needs a command for "rebuild all views from the model using the view saved settings" so you could do them all at once. It takes a long time to do each view seperately and someone to sit behind the computer and watch each view regenerate. Time is money.......