Interactive Schedule Frustration!!! - Part 2
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2010-07-14 07:09 AM
2010-07-14
07:09 AM
I was of the opinion that when you placed the door/window, the side edge of the wall you clicked was the 'front'. The documentation convention i want to maintain is that on a schedule, you see the elevation from outside (that is, from the exterior of the building/room/etc) irrespective of whether the door itself opens towards or away from you.
Now that i've been trying to use the interactive schedule for a bit, i'm not sure.
The front view seems to generally show the side that the door open toward; this is not acceptable - take a scenario where you have a wall with a series of doors that may have varying directions of opening - i think that for the purpose of clarity, the schedule should show all the frames and doors from the same side. I'm aware that you can add a plan view to the schedule, or refer to the floor plan for clarification, but still, the inconsistency seems odd to me.
Labels:
- Labels:
-
Data management
10 REPLIES 10

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
2011-01-25 05:59 PM
2011-01-25
05:59 PM
Along those same lines...
Why can I not change the LAYER combination of a Schedule VIEW once it's been created? if I chose the VIEW in the Navigator and MODIFY SOURCE VIEW SETTINGS... layer combo is greyed out?... Stinks when you set up a CLONE to do scheduling...
And, I gather that they layering does not affect the schedule (because the CRITERIA sets all that up)... but when going to a Door Schedule (from the view map) and coming back to the plan, I always have to change layer sets to get the correct layers.
Ugh..
Why can I not change the LAYER combination of a Schedule VIEW once it's been created? if I chose the VIEW in the Navigator and MODIFY SOURCE VIEW SETTINGS... layer combo is greyed out?... Stinks when you set up a CLONE to do scheduling...
And, I gather that they layering does not affect the schedule (because the CRITERIA sets all that up)... but when going to a Door Schedule (from the view map) and coming back to the plan, I always have to change layer sets to get the correct layers.
Ugh..
Duane
Visual Frontiers
AC25 :|: AC26 :|: AC27
:|: Enscape3.4:|:TwinMotion
DellXPS 4.7ghz i7:|: 8gb GPU 1070ti / Alienware M18 Laptop
Visual Frontiers
AC25 :|: AC26 :|: AC27
:|: Enscape3.4:|:TwinMotion
DellXPS 4.7ghz i7:|: 8gb GPU 1070ti / Alienware M18 Laptop
- « Previous
-
- 1
- 2
- Next »
- « Previous
-
- 1
- 2
- Next »