We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

"Total" text in schedules

Bidaya
Contributor
Hi everyone
I was wondering if there is a way to add the term "total" on the same line as the total value in schedules.
Thanks for reading.
2 REPLIES 2
Laszlo Nagy
Community Admin
Community Admin
Unfortunately, it is not possible to do it in the Schedule.
What you can do is you can place the generated Schedule on a Layout and add the desired Text on the Layout so as to achieve the desired final result. However, keep in mind that this is a "hack" and you will have to check the position of that Text on the layout if the Schedule is regenerated to make sure it is in the correct position.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac27
Bidaya
Contributor
Thank you Lazlo
too bad because when you export the schedules to Excel it can be interesting to have the "Total" text included...well maybe in a next version...
Best regards.