There is no default as such.
You control what you want at the bottom left of the organiser before you drag from the view map to the project map - or you can change the settings after you create the view.
I find the easiest way is to open the viewpoint you want to save to make sure it is set up correctly.
Then these 'defaults' will already be set in the organiser and will be used when creating the view.
This way you have seen the view before you create it so you know it is correct.
If you then have other similar views you can just go ahead and drag those across with the same settings.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11